1 00:00:12,860 --> 00:00:10,910 Saturn five quarterly film reports 2 00:00:15,670 --> 00:00:12,870 number eight covers progress during the 3 00:00:20,570 --> 00:00:15,680 period September October and November at 4 00:00:23,290 --> 00:00:20,580 1964 throughout the Porter Boeing and 5 00:00:27,950 --> 00:00:23,300 Marshall continued s1c stage development 6 00:00:30,109 --> 00:00:27,960 manufacturing and testing at Marshall 7 00:00:32,840 --> 00:00:30,119 Boeing successfully completed full 8 00:00:35,750 --> 00:00:32,850 pressure hydrostatic testing of the s1c 9 00:00:37,430 --> 00:00:35,760 test fuel tank after resolving the test 10 00:00:40,040 --> 00:00:37,440 equipment problems encountered last 11 00:00:43,549 --> 00:00:40,050 quarter this was followed by successful 12 00:00:45,380 --> 00:00:43,559 LOX tunnel testing early in the quarter 13 00:00:48,380 --> 00:00:45,390 Marshall personnel during a routine 14 00:00:51,680 --> 00:00:48,390 inspection discovered weld micro cracks 15 00:00:55,580 --> 00:00:51,690 on s1 CT and s-1 CS assemblies 16 00:00:57,830 --> 00:00:55,590 previously manufactured after detailed 17 00:00:59,900 --> 00:00:57,840 investigations and studies Marshall 18 00:01:03,080 --> 00:00:59,910 resolved the problem by micro shaving 19 00:01:04,939 --> 00:01:03,090 all weld beads necessary action is being 20 00:01:09,080 --> 00:01:04,949 taken to prevent recurrence of the 21 00:01:10,940 --> 00:01:09,090 problem despite the welding problem s 1c 22 00:01:13,820 --> 00:01:10,950 stage manufacturing and assembly 23 00:01:17,380 --> 00:01:13,830 continued at a satisfactory pace mating 24 00:01:21,100 --> 00:01:17,390 of the s1 CT forward skirt LOX tank and 25 00:01:24,140 --> 00:01:21,110 entertained section was completed on 26 00:01:25,580 --> 00:01:24,150 November 2nd this major assembly was 27 00:01:27,679 --> 00:01:25,590 moved from the vertical Assembly 28 00:01:30,920 --> 00:01:27,689 Building to the horizontal assembly area 29 00:01:32,440 --> 00:01:30,930 where final s 1ct assembly will take 30 00:01:36,080 --> 00:01:32,450 place 31 00:01:37,850 --> 00:01:36,090 s1 CT thrust structure manufacture was 32 00:01:41,210 --> 00:01:37,860 completed with installation of heat 33 00:01:44,660 --> 00:01:41,220 shield panels and locks and few old duct 34 00:01:46,670 --> 00:01:44,670 supports the structure was then moved 35 00:01:50,420 --> 00:01:46,680 into the vertical Assembly Building and 36 00:01:51,830 --> 00:01:50,430 joined to the s1 CT fuel tank the unit 37 00:01:54,230 --> 00:01:51,840 will be transferred to the horizontal 38 00:01:58,550 --> 00:01:54,240 assembly area for final mating to the 39 00:02:00,950 --> 00:01:58,560 LOX tank assembly early next quarter s1 40 00:02:03,050 --> 00:02:00,960 CS cylindrical skin assembly and 41 00:02:06,679 --> 00:02:03,060 bulkhead fabrication continued this 42 00:02:09,020 --> 00:02:06,689 quarter the forward locks bulkhead for 43 00:02:11,630 --> 00:02:09,030 this ground test stage is now being 44 00:02:13,850 --> 00:02:11,640 built at Marshall the original bulkhead 45 00:02:16,280 --> 00:02:13,860 fabricated by Boeing was rejected 46 00:02:18,680 --> 00:02:16,290 Mishu because of unacceptable welding 47 00:02:20,540 --> 00:02:18,690 Boeing is attempting to improve its 48 00:02:24,200 --> 00:02:20,550 welding techniques to prevent this 49 00:02:27,650 --> 00:02:24,210 problem from recurring the first inner 50 00:02:29,570 --> 00:02:27,660 tank for the s1 CS test program built by 51 00:02:31,790 --> 00:02:29,580 Boeing Michou has been placed in 52 00:02:34,340 --> 00:02:31,800 Marshalls new load tests tower and 53 00:02:37,760 --> 00:02:34,350 preparations are underway for structural 54 00:02:41,870 --> 00:02:37,770 testing bulkhead fabrication for the 55 00:02:46,190 --> 00:02:41,880 first two flight stages s1 C 1 and s 1 C 56 00:02:48,920 --> 00:02:46,200 2 is progressing steadily construction 57 00:02:51,800 --> 00:02:48,930 of Marshalls s 1 C static test stand is 58 00:02:55,160 --> 00:02:51,810 virtually complete with hold down arms 59 00:02:57,710 --> 00:02:55,170 installed this quarter at Marshalls 60 00:03:01,460 --> 00:02:57,720 Michou Operations Boeing continued work 61 00:03:04,280 --> 00:03:01,470 on the s-1 cg dynamic test stage thrust 62 00:03:07,810 --> 00:03:04,290 structure base heat shield support for 63 00:03:10,699 --> 00:03:07,820 the thrust structure and inter tank 64 00:03:14,720 --> 00:03:10,709 assembly of the stage bulkheads also 65 00:03:16,940 --> 00:03:14,730 continued other s1 C component worked by 66 00:03:19,360 --> 00:03:16,950 Boeing included assembly of the forward 67 00:03:22,070 --> 00:03:19,370 skirt for the first flight stage and 68 00:03:25,520 --> 00:03:22,080 chemical cleaning of the Y rings for the 69 00:03:27,830 --> 00:03:25,530 second flight stage major facilities 70 00:03:30,770 --> 00:03:27,840 construction at Michou included work 71 00:03:33,710 --> 00:03:30,780 under stage test facility the high 72 00:03:35,900 --> 00:03:33,720 pressure test facility and the vertical 73 00:03:44,570 --> 00:03:35,910 Assembly Building with its hydrostatic 74 00:03:47,150 --> 00:03:44,580 test tower and final assembly tower at 75 00:03:50,509 --> 00:03:47,160 the s2 static test facility at Santa 76 00:03:52,820 --> 00:03:50,519 Susana North American Aviation's space & 77 00:03:55,009 --> 00:03:52,830 Information Systems Division directed 78 00:03:57,229 --> 00:03:55,019 major activity during September and 79 00:03:59,570 --> 00:03:57,239 October toward preparations for the 80 00:04:03,020 --> 00:03:59,580 initial firing of a single engine of the 81 00:04:05,030 --> 00:04:03,030 battleship test stage this activity 82 00:04:07,570 --> 00:04:05,040 included the installation of the center 83 00:04:09,740 --> 00:04:07,580 j2 engine under battleship and 84 00:04:11,270 --> 00:04:09,750 installation and check out of ground 85 00:04:13,580 --> 00:04:11,280 support equipment and systems 86 00:04:17,420 --> 00:04:13,590 development device at the test stand and 87 00:04:19,719 --> 00:04:17,430 in the control center systems check out 88 00:04:22,219 --> 00:04:19,729 and cryogenics testing were completed 89 00:04:23,930 --> 00:04:22,229 continuity checks were made and the 90 00:04:26,779 --> 00:04:23,940 integrated checkout or a sequential 91 00:04:27,770 --> 00:04:26,789 countdown conducted culminating these 92 00:04:31,550 --> 00:04:27,780 months of intense 93 00:04:33,230 --> 00:04:31,560 of preparation on November night the s2 94 00:04:36,560 --> 00:04:33,240 battleship first ignition was 95 00:04:38,750 --> 00:04:36,570 successfully accomplished in the 96 00:04:42,140 --> 00:04:38,760 vertical Assembly Building of s and I DS 97 00:04:45,200 --> 00:04:42,150 C or Beach facility manufacturing of s2 98 00:04:47,840 --> 00:04:45,210 s structural test stage continued during 99 00:04:50,300 --> 00:04:47,850 the report period the common bulkhead 100 00:04:52,700 --> 00:04:50,310 completed last quarter was mated to the 101 00:04:54,110 --> 00:04:52,710 liquid hydrogen tank cylinder and the 102 00:04:56,180 --> 00:04:54,120 assembly was installed in the 103 00:04:58,250 --> 00:04:56,190 hydrostatic test station where 104 00:05:02,300 --> 00:04:58,260 hydrostatic testing was successfully 105 00:05:05,120 --> 00:05:02,310 accomplished in late October the after 106 00:05:07,430 --> 00:05:05,130 locks bulkhead for s2 s failed during 107 00:05:09,980 --> 00:05:07,440 its in process component hydrostatic 108 00:05:12,409 --> 00:05:09,990 testing prior to being welded to the LOX 109 00:05:14,480 --> 00:05:12,419 tank the character of the failure was a 110 00:05:16,940 --> 00:05:14,490 fracture which propagated through the 111 00:05:19,730 --> 00:05:16,950 apex sections of eight of the 12 gore 112 00:05:22,150 --> 00:05:19,740 segments of the bulkhead an extensive 113 00:05:24,440 --> 00:05:22,160 investigation by Marshall and s NID 114 00:05:27,159 --> 00:05:24,450 revealed that the failure was caused 115 00:05:30,379 --> 00:05:27,169 primarily by manufacturing defects and 116 00:05:32,390 --> 00:05:30,389 inadequate detail inspection corrective 117 00:05:34,909 --> 00:05:32,400 action has been initiated and a 118 00:05:38,540 --> 00:05:34,919 replacement bulkhead for s2 s will be 119 00:05:41,570 --> 00:05:38,550 available in December Assembly of the 120 00:05:43,159 --> 00:05:41,580 first s2 stage transporter was completed 121 00:05:45,310 --> 00:05:43,169 at the American machine and foundry 122 00:05:47,060 --> 00:05:45,320 corporation at York Pennsylvania 123 00:05:49,550 --> 00:05:47,070 acceptance testing was completed 124 00:05:52,310 --> 00:05:49,560 satisfactorily and the vehicle shipped 125 00:05:54,380 --> 00:05:52,320 to s and IDs seal Beach facility where 126 00:05:56,840 --> 00:05:54,390 functional testing and mobility runs 127 00:06:04,930 --> 00:05:56,850 were performed the transporter will be 128 00:06:10,219 --> 00:06:07,700 Douglas Aircraft Company Sacramento 129 00:06:12,980 --> 00:06:10,229 tests aerial preparations for the first 130 00:06:16,040 --> 00:06:12,990 s4v battleship hot firing were underway 131 00:06:19,000 --> 00:06:16,050 during September fuel leak checks and 132 00:06:21,409 --> 00:06:19,010 pneumatic lines checks were performed 133 00:06:24,260 --> 00:06:21,419 technicians checked engine bleed gas 134 00:06:27,440 --> 00:06:24,270 igniters and the water and propellant 135 00:06:32,719 --> 00:06:27,450 distribution complex and engine diffuser 136 00:06:34,760 --> 00:06:32,729 water tests was also run j2 engine 137 00:06:37,630 --> 00:06:34,770 thrust chamber chill down tests were 138 00:06:41,089 --> 00:06:37,640 successfully conducted in early October 139 00:06:41,600 --> 00:06:41,099 on November 7th the first hot firing was 140 00:06:44,179 --> 00:06:41,610 cut 141 00:06:47,300 --> 00:06:44,189 prior to mainstage by a gas generator 142 00:06:50,059 --> 00:06:47,310 over-temperature command a second firing 143 00:06:53,209 --> 00:06:50,069 on November 24th was a successful one 144 00:06:56,230 --> 00:06:53,219 second duration test ten and fifty 145 00:06:59,899 --> 00:06:56,240 second firings are scheduled in December 146 00:07:02,659 --> 00:06:59,909 at SAC tous gamma complex the attitude 147 00:07:04,909 --> 00:07:02,669 control engines for the s4v auxiliary 148 00:07:08,330 --> 00:07:04,919 propulsion system were installed in 149 00:07:10,550 --> 00:07:08,340 September a series of single and 150 00:07:12,740 --> 00:07:10,560 multiple engine first phase development 151 00:07:14,679 --> 00:07:12,750 firings was successfully conducted 152 00:07:18,529 --> 00:07:14,689 during October 153 00:07:20,659 --> 00:07:18,539 also at Sacto DAC continued preparing 154 00:07:22,399 --> 00:07:20,669 beta test stands number three for 155 00:07:25,070 --> 00:07:22,409 installing the facilities check out 156 00:07:28,879 --> 00:07:25,080 stage four propellant loading tests in 157 00:07:31,429 --> 00:07:28,889 early March at Douglass's Huntington 158 00:07:33,980 --> 00:07:31,439 Beach facility assembly and check out of 159 00:07:35,990 --> 00:07:33,990 the s4v dynamic test stage has been 160 00:07:37,820 --> 00:07:36,000 completed and the stage is being 161 00:07:41,600 --> 00:07:37,830 prepared for shipment to the Marshall 162 00:07:43,459 --> 00:07:41,610 Center in early December the original 163 00:07:45,649 --> 00:07:43,469 all system stage which has been 164 00:07:47,749 --> 00:07:45,659 redecorated the facilities checkout 165 00:07:50,269 --> 00:07:47,759 stage underwent cleaning and 166 00:07:52,279 --> 00:07:50,279 installation this quarter the stage will 167 00:07:54,559 --> 00:07:52,289 be used for propellant loading tests at 168 00:07:58,790 --> 00:07:54,569 SEC tow and facilities checkout at 169 00:08:01,129 --> 00:07:58,800 Kennedy Space Center components from the 170 00:08:04,010 --> 00:08:01,139 original facilities checkout stage have 171 00:08:06,379 --> 00:08:04,020 been reallocated for use on an s4v 172 00:08:08,899 --> 00:08:06,389 sectional mock-up which will be shipped 173 00:08:13,010 --> 00:08:08,909 to Marshall for use on an overall Saturn 174 00:08:16,040 --> 00:08:13,020 5 simulator fabrication and assembly of 175 00:08:19,999 --> 00:08:16,050 components for the first Saturn 5 s4b 176 00:08:23,329 --> 00:08:20,009 flight stage 501 got underway at Douglas 177 00:08:25,129 --> 00:08:23,339 Santa Monica this quarter at the air 178 00:08:27,920 --> 00:08:25,139 research test facility in Phoenix 179 00:08:31,010 --> 00:08:27,930 Arizona pressure testing to failure of 180 00:08:41,140 --> 00:08:31,020 s4b propellant loading flex hoses was 181 00:08:46,610 --> 00:08:44,060 at the edward's rocket engine test site 182 00:08:48,830 --> 00:08:46,620 in California Rocketdyne began flight 183 00:08:51,770 --> 00:08:48,840 rating tests of the f1 engine on 184 00:08:54,290 --> 00:08:51,780 November 16th the tests are progressing 185 00:08:58,280 --> 00:08:54,300 satisfactorily and will be completed by 186 00:09:01,070 --> 00:08:58,290 December 31st operational readiness of 187 00:09:03,170 --> 00:09:01,080 the two new f1 production engine test 188 00:09:05,270 --> 00:09:03,180 stands at Edwards was marked by 189 00:09:07,520 --> 00:09:05,280 ceremonies held on October 9th 190 00:09:29,550 --> 00:09:07,530 the event was climaxed by a full 191 00:09:37,510 --> 00:09:33,700 as part of the continuing effort to 192 00:09:40,240 --> 00:09:37,520 improve f1 engine reliability Rocketdyne 193 00:09:43,270 --> 00:09:40,250 has designed and tested a new tight fit 194 00:09:45,490 --> 00:09:43,280 locks impeller spline coupling test 195 00:09:48,340 --> 00:09:45,500 results indicate the new design with 196 00:09:52,660 --> 00:09:48,350 reduction of turbo pump rpm will 197 00:09:55,120 --> 00:09:52,670 eliminate LOX pump explosions testing of 198 00:09:57,790 --> 00:09:55,130 the mark 10 turbo pump with shot peened 199 00:10:00,070 --> 00:09:57,800 locks impellers indicated a tenfold 200 00:10:03,250 --> 00:10:00,080 increase in the number of cycles to 201 00:10:04,990 --> 00:10:03,260 failure as a result all existing turbo 202 00:10:08,830 --> 00:10:05,000 pumps have been retrofitted with the 203 00:10:10,740 --> 00:10:08,840 shot peened impeller production of f1 204 00:10:13,360 --> 00:10:10,750 engines at rocky dines canoga park 205 00:10:14,650 --> 00:10:13,370 manufacturing area progressed steadily 206 00:10:17,050 --> 00:10:14,660 during the quarter 207 00:10:19,720 --> 00:10:17,060 this facility is capable of handling the 208 00:10:23,680 --> 00:10:19,730 final assembly and check out of six f-1 209 00:10:25,990 --> 00:10:23,690 engines simultaneously progress is 210 00:10:28,390 --> 00:10:26,000 continuing toward an early 1965 211 00:10:35,260 --> 00:10:28,400 completion of rocky Dynes manufacturing 212 00:10:38,140 --> 00:10:35,270 building number four Santa Susana the 213 00:10:40,000 --> 00:10:38,150 two position tests turned Bravo one has 214 00:10:42,820 --> 00:10:40,010 been converted to an f1 engine 215 00:10:44,890 --> 00:10:42,830 components test facility providing for 216 00:10:47,410 --> 00:10:44,900 longer duration tests than were formerly 217 00:10:50,140 --> 00:10:47,420 possible one position would be used for 218 00:10:58,390 --> 00:10:50,150 gas generator testing and the other for 219 00:11:00,700 --> 00:10:58,400 heat exchanger tests at the Marshall 220 00:11:03,340 --> 00:11:00,710 Center propulsion system testing of the 221 00:11:05,740 --> 00:11:03,350 second f1 production engine began last 222 00:11:08,110 --> 00:11:05,750 quarter continued during this report 223 00:11:10,930 --> 00:11:08,120 period the first production engine is 224 00:11:14,050 --> 00:11:10,940 undergoing minor rework in preparation 225 00:11:17,380 --> 00:11:14,060 for installation in Marshalls new f1 226 00:11:19,450 --> 00:11:17,390 engine static test and in January the 227 00:11:28,780 --> 00:11:19,460 first firing in the new stand is 228 00:11:32,410 --> 00:11:28,790 scheduled for early 1965 during a static 229 00:11:34,600 --> 00:11:32,420 firing of engine j2 mm on September 19th 230 00:11:38,280 --> 00:11:34,610 at Santa Susana a gas generator 231 00:11:41,079 --> 00:11:38,290 explosion occurred as a result 232 00:11:41,920 --> 00:11:41,089 Rocketdyne built this mock-up of the j2 233 00:11:44,139 --> 00:11:41,930 new matte 234 00:11:47,019 --> 00:11:44,149 control system including the gas 235 00:11:50,829 --> 00:11:47,029 generator to evaluate possible solutions 236 00:11:53,290 --> 00:11:50,839 to the problem analysis of test data on 237 00:11:55,450 --> 00:11:53,300 one proposed solution connecting the gas 238 00:11:57,820 --> 00:11:55,460 generator valve cast to the control 239 00:11:59,889 --> 00:11:57,830 pressure point indicated this would be 240 00:12:03,310 --> 00:11:59,899 successful in preventing one possible 241 00:12:04,930 --> 00:12:03,320 cause of the explosion other research 242 00:12:06,850 --> 00:12:04,940 and development activity and the j2 243 00:12:09,670 --> 00:12:06,860 engine by rocky day in this quarter 244 00:12:11,410 --> 00:12:09,680 included flame resistance testing of the 245 00:12:14,680 --> 00:12:11,420 connector for the flexible armored 246 00:12:16,780 --> 00:12:14,690 harness now used for all j2 electrical 247 00:12:19,660 --> 00:12:16,790 control and instrumentation harness 248 00:12:22,360 --> 00:12:19,670 wiring in this test the system did not 249 00:12:34,540 --> 00:12:22,370 short out for 6 and 1/2 minutes under a 250 00:12:39,650 --> 00:12:37,790 J two-engine preliminary flight rating 251 00:12:42,860 --> 00:12:39,660 tests were successfully completed 252 00:12:45,980 --> 00:12:42,870 November 25th by Rocketdyne at its santa 253 00:12:48,559 --> 00:12:45,990 susana test site the j2 flight rating 254 00:12:52,639 --> 00:12:48,569 test is scheduled to be conducted early 255 00:12:55,850 --> 00:12:52,649 in 1965 following a final test vertical 256 00:12:59,119 --> 00:12:55,860 test stand 3a at Santa Susana was closed 257 00:13:01,429 --> 00:12:59,129 for extensive renovation close coupling 258 00:13:03,829 --> 00:13:01,439 of propellant tanks and improved vacuum 259 00:13:05,960 --> 00:13:03,839 jacketing under hydrogen lines are 260 00:13:08,090 --> 00:13:05,970 expected to provide a better engine 261 00:13:11,049 --> 00:13:08,100 start condition and more effective 262 00:13:13,999 --> 00:13:11,059 altitude simulation for a flight rating 263 00:13:16,100 --> 00:13:14,009 at the Marshall Center construction of 264 00:13:18,889 --> 00:13:16,110 the j2 engine test facility is 265 00:13:27,259 --> 00:13:18,899 approximately 95% finished with 266 00:13:29,809 --> 00:13:27,269 completion due in January the first 267 00:13:32,150 --> 00:13:29,819 redesigned Saturn 5 instrument unit 268 00:13:34,519 --> 00:13:32,160 structure was delivered to Marshall by 269 00:13:36,920 --> 00:13:34,529 General Dynamics Fort Worth Texas this 270 00:13:40,639 --> 00:13:36,930 quarter the structure will be used for 271 00:13:43,240 --> 00:13:40,649 the dynamic test unit vibration testing 272 00:13:46,639 --> 00:13:43,250 for evaluation of IU cold plates 273 00:13:49,220 --> 00:13:46,649 manufactured by four vendors fqo North 274 00:13:51,499 --> 00:13:49,230 American solar aircraft and air angka 275 00:13:53,629 --> 00:13:51,509 was in progress at Marshall during the 276 00:13:55,939 --> 00:13:53,639 quarter vendor selection will be made 277 00:13:59,689 --> 00:13:55,949 following completion of evaluation 278 00:14:01,639 --> 00:13:59,699 testing as negotiations continued with 279 00:14:04,999 --> 00:14:01,649 International Business Machines for the 280 00:14:07,129 --> 00:14:05,009 IU mission contract IBM personnel are 281 00:14:11,059 --> 00:14:07,139 already at work in their new Huntsville 282 00:14:13,549 --> 00:14:11,069 engineering laboratories one of the most 283 00:14:15,980 --> 00:14:13,559 significant activities in which IBM is 284 00:14:18,710 --> 00:14:15,990 participating is preparation for the 285 00:14:21,410 --> 00:14:18,720 flight systems test program a thermal 286 00:14:23,840 --> 00:14:21,420 vacuum test of the entire IU under 287 00:14:26,179 --> 00:14:23,850 simulated space flight conditions to be 288 00:14:27,980 --> 00:14:26,189 performed in an environmental chamber at 289 00:14:31,369 --> 00:14:27,990 Douglas aircrafts Huntington Beach 290 00:14:33,530 --> 00:14:31,379 facility to reduce costly duplication of 291 00:14:35,569 --> 00:14:33,540 testing facilities special test 292 00:14:37,939 --> 00:14:35,579 equipment which will be required both at 293 00:14:40,189 --> 00:14:37,949 Huntsville and Huntington Beach is being 294 00:14:44,780 --> 00:14:40,199 installed in trailers which can be air 295 00:14:47,180 --> 00:14:44,790 transported between these locations IB 296 00:14:49,790 --> 00:14:47,190 personnel this quarter also performed 297 00:14:53,360 --> 00:14:49,800 functional testing of the IU radar 298 00:14:57,080 --> 00:14:53,370 altimeter using an MSF C furnished test 299 00:14:59,810 --> 00:14:57,090 set another test involved a circuit 300 00:15:02,690 --> 00:14:59,820 analysis of the I use remote digital sub 301 00:15:04,940 --> 00:15:02,700 multiplexer breadboard circuit modules 302 00:15:07,910 --> 00:15:04,950 which duplicate production hardware in 303 00:15:10,250 --> 00:15:07,920 component utilization and location are 304 00:15:12,320 --> 00:15:10,260 tested in a temperature chamber to 305 00:15:14,540 --> 00:15:12,330 detect possible circuit malfunctions 306 00:15:17,930 --> 00:15:14,550 resulting from components tolerance 307 00:15:20,420 --> 00:15:17,940 accumulations also in progress this 308 00:15:23,090 --> 00:15:20,430 quarter were desired evaluation Studies 309 00:15:26,150 --> 00:15:23,100 on a newly designed channel unit for the 310 00:15:29,180 --> 00:15:26,160 IU telemetry system all these operations 311 00:15:31,250 --> 00:15:29,190 are providing valuable experience as IBM 312 00:15:34,340 --> 00:15:31,260 phases into complete responsibility for 313 00:15:42,290 --> 00:15:34,350 a mission qualified Saturn 5 instrument 314 00:15:44,810 --> 00:15:42,300 unit the construction phase of the 315 00:15:47,270 --> 00:15:44,820 Saturn 5 dynamic test stand at Marshall 316 00:15:49,430 --> 00:15:47,280 is complete except for installation of 317 00:15:53,450 --> 00:15:49,440 small items such as bracket tray and 318 00:15:55,670 --> 00:15:53,460 grating components of the second s1c 319 00:15:58,280 --> 00:15:55,680 transporter delivered by frou Hoff of 320 00:16:02,000 --> 00:15:58,290 Los Angeles in early November have been 321 00:16:04,010 --> 00:16:02,010 assembled at Marshall at the Saturn 5 322 00:16:06,170 --> 00:16:04,020 ground support equipment test facility 323 00:16:08,660 --> 00:16:06,180 construction is virtually complete 324 00:16:11,450 --> 00:16:08,670 except for installation of cryogenic 325 00:16:13,520 --> 00:16:11,460 lines all technical systems equipment 326 00:16:16,250 --> 00:16:13,530 has been delivered and installation is 327 00:16:20,210 --> 00:16:16,260 about 50% finished with completion due 328 00:16:22,910 --> 00:16:20,220 in January overall construction of the 329 00:16:24,950 --> 00:16:22,920 Saturn 5 barge dock and loading facility 330 00:16:28,670 --> 00:16:24,960 on the Tennessee River is practically 331 00:16:31,100 --> 00:16:28,680 complete at Marshalls Mississippi test 332 00:16:34,520 --> 00:16:31,110 facility construction proceeded under 333 00:16:37,940 --> 00:16:34,530 test complex comprising the s 1 C dual 334 00:16:42,110 --> 00:16:37,950 position static test stand and the 2 s 2 335 00:16:44,420 --> 00:16:42,120 static test stands the laboratory and 336 00:16:47,630 --> 00:16:44,430 engineering complex which contains the 337 00:16:50,960 --> 00:16:47,640 office and administration building the 338 00:16:55,340 --> 00:16:50,970 data handling center and the telephone 339 00:16:57,620 --> 00:16:55,350 and terminal building and the support 340 00:16:58,730 --> 00:16:57,630 services complex including such 341 00:17:02,180 --> 00:16:58,740 facilities as 342 00:17:07,240 --> 00:17:02,190 emergency services building MTF 343 00:17:11,000 --> 00:17:07,250 warehouse site maintenance building and 344 00:17:15,260 --> 00:17:11,010 central heating plant in summary 345 00:17:16,850 --> 00:17:15,270 September October and November 1964 were 346 00:17:19,329 --> 00:17:16,860 months of highly significant 347 00:17:22,309 --> 00:17:19,339 achievements in the Saturn 5 program 348 00:17:25,010 --> 00:17:22,319 Assembly of s1c stages progressed 349 00:17:27,260 --> 00:17:25,020 steadily major milestones were reached 350 00:17:29,810 --> 00:17:27,270 in the upper stage programs with both 351 00:17:33,310 --> 00:17:29,820 the first s - battleship Hut firing and 352 00:17:35,660 --> 00:17:33,320 the first s4b battleship Hut firing 353 00:17:38,419 --> 00:17:35,670 significant progress was also achieved 354 00:17:41,030 --> 00:17:38,429 on the engine programs the instrument